Search
 

Shop By Product


Shop By Service

  • WASTEWATER
  • SEPTIC SYSTEMS
  • GREASE TRAPS
  • GARBAGE DISPOSALS
  • ODOR CONTROL
  • URINALS

Shop By Use

RESIDENTIAL
COMMERCIAL
INDUSTRIAL
MUNICIPAL

HomeShop By ProductShop By ServiceShop By UseCustomer ServiceSeptic 101
Shopping Cart(0)  Contact Us  My Account

"BC+"
Lift Station Block

"BC+" is an improved biological product, specifically formulated and packaged for use in lift stations.

To assure optimal performance of these organisms, under the toughest conditions, they are produced and blended together with "high potency" nutrients and stimulants.

"BC+" also contains specialty penetrants and surfactants which loosen and liquefy heavy grease deposits, thereby assisting in their biodegradation.

Grease Control in Lift Stations - "BC+" is packaged specially to maximize performance in lift stations.

PACKAGING DESCRIPTION

2lbs. cube in a mesh application bag, 12 per cs
5lbs cube in a mesh application bag, 4 per cs.

STORAGE:
DO NOT FREEZE! Store in cool dry location. Do not inhale mists, avoid excessive skin contact. SEE M.S.D.S.

How long will it last?

Field experience has shown that in a pumping station with a flow of 500,000 gpd, "BC+" should last 30 days. This is not to say however that in a station with a flow of 50,000 gpd that the "BC+" will last 300 days. We have had reports of "BC" lasting as long as three weeks. One customer with a pumping station with a flow of 780,000 gpd reports that the product lasts on an average of 40 days.

SLOW RELEASE
disperses bacterial product as it dissolves!

HOW TO USE “BC+”

Add the “BC+” cubes directly to the lift station.

  1. When locating the “BC+” cube in the wet well/ lift station, DO NOT place “BC” cube directly into the flow of incoming sewage. The turbulence and “washing effect” will greatly reduce the longevity of this product. Ideally, the “BC+” cube should be placed in a less turbulent area of the wet well/ lift station, but not in a dead spot.
  2. “BC+” should be suspended in the wet well/lift station so that it is always submerged in water, even at the lowest water level. This will assure maximum contact time with the organics providing superior results.
  3. If a grease shelf is present during placement of “BC+”, it is recommended to raise the high level flow so that the bacteria can attack the grease shelf from the top, bottom and sides.
  4. Results should be obtained in four to eight weeks from the time of application. If grease shelves are present at the time of application, a longer period of time may be required to obtain results.

Flow Rate Maintenance

Up to 25,000gpd 2lbs per month

Up to 50,000gpd 5lbs per month

Up to 100,000gpd 5-10lbs per month

Up to 250,000gpd 10lbs per month

Dosage rates very with flow rates, retention times and grease accumulation. This rate is for a typical lift station.

"BC+" Lift Station Block FAQ's

Once placed into my lift-station, how long does the BC+ block last?
With a flow rate of 500,000 gpd, the BC+ block should last 30 days. This is not to say however that in a station with a flow rate of 50,000 gpd that the BC+ block will last 300 days. We have had reports of the block lasting as long as three weeks. One customer with a pumping station with a flow of 780,000 gpd reports that the product lasts on an average of 40 days.



Options:

Quantity:   

 E-mail this product to a friend